DESPITE THE EXCEPTIONALLY wet November, Mrs Gibney was not too concerned that flooding at her home was imminent.
Making her way to work, she could see no signs of overflow in the Lee Fields between Ballincollig and Cork City that tended to flood well in advance of land beside her family home at Inniscarra Bridge.
That evening, things had changed dramatically as she sat down for dinner with her husband and their two visiting daughters. Opening the door for the family’s Alsatian, Mr Gibney was greeted with half a foot of water in which the family’s other dog, a Westie, was floating. By 10pm the family were trapped upstairs awaiting rescue by the fire service.
You can support the ongoing work of the Noteworthy team through their general fund with a monthlyor once-off contribution.
At the same time, a University College Cork (UCC) staff member was up to their chin in water trying to rescue art from the Glucksman Gallery basement. Shops and homes across the city would soon be inundated with water, as the city faced the biggest flood event in decades. This was Thursday 19 November 2009.
The events of 2009 and the fate of the Gibney family were detailed in High Court testimonies in relation to a case over damages sought by UCC from the ESB over the impact of the release of water from Inniscarra dam. They also serve as a reminder to the people of Cork that they live and work in a low-lying and intertidal city built on a cluster of small reclaimed marshy islands.
Flooding on the Lee fields Earth Horizon Productions
Earth Horizon Productions
Now, over a decade later, a controversial flood relief scheme led by the Office of Public Works (OPW) is in the final stages of approval, with some community groups strongly opposed to the plans. These centre on the use of embankments and flood walls downstream of Inniscarra and into the city, together with advanced flood forecasting and revised dam operational procedures to lower reservoir levels in advance of flooding events.
Many of those in opposition are concerned with the potential impact of the flood walls on the architecture and heritage of the city centre. Some also feel that decisions were made without the meaningful participation of the people of Cork in the development of the plans.
Over the past two months, Noteworthy have examined the Lower Lee Flood Relief Scheme (LLFRS) in detail, combed through hundreds of pages of documents, many obtained through freedom of information (FOI) requests, and spoke to people from all over the world. We reveal:
Despite ongoing controversy, the scheme’s project team said it is happy with its public consultation and will “not be recommending any alternative to LLFRS now or in the future”.
The project’s steering group decided that alternative options put forward by the public on natural flood management and tidal barriers should only receive a cursory desk-study level treatment.
The project team claims the main reason the public consultation was extended was due to the large amount of interest in the scheme, but the minutes of the scheme’s steering group meeting from January 2017 state that the consultation deadline was to be extended as various reports were “not yet in the public domain”.
Experts in climate change, human geography and natural hazards say that the public may not have been involved in the scheme’s design process early enough and this is a key factor in some distrust of the Cork city scheme.
No independent review was launched on the controversial scheme in spite of two Cork City Council motions calling for one. This decision was backed by Minister of State for the OPW and Flood Relief, Kevin ‘Boxer’ Moran.
Last October, the OPW and Cork City Council made a rare move by issuing a statement directly discrediting campaign group Save Cork City’s proposal in a brochure that cost €28,285.
An Irish-Dutch collaborative project found that “about 80% of the sites studied in Ireland were using walls to stop the water”, according to one of the architects involved, who feels this “is not a sustainable solution moving forward”.
Costs will rise beyond the original estimate of €160 million “due to inflation” for this, the largest investment in flood relief in the history of the State.
We also talk to Irish and international experts about best practices in flood management and how Irish policy needs an update.
A 14-year-old plan
Plans from the OPW were already afoot as far back as 2006 to set out a long-term strategy to manage flood risk along the Lee catchment that would heavily influence the make-up of flood defence plans for the city.
The Lee Catchment Flood Risk Assessment and Management (CFRAM) plan was the pilot case in Ireland and the proposals outlined in it now form the bedrock of the LLFRS.
Kicking off the design process back in 2013, it was originally planned to commence the first phase of construction by September 2020. However, the original timeline hit a snag when opposition arose to the scheme’s design which was presented to the public at large exhibition displays in the city over Christmas 2016.
The main concerns raised at this stage were the height of the proposed walls in the city centre, how this might change how people would interact with the river and the conservation of the historic quays.
It was during this phase that the seeds of the most vocal opponents of the plans, Save Cork City (SCC), were planted. John Hegarty, one of the community organisation’s leading figures, said it originally formed to raise awareness of the plans and “represent people that felt that they were never represented”.
“I think the attitude was that it was a process that [the OPW] had to go through… The decisions were made, the designs were done,” he added. The group soon picked up a strong social media presence and is now a registered CLG which can receive donations. It lists numerous local businesses and people as its supporters, many of which display ‘Love the Lee’ discs outside their premises.
Local artist Declan O'Mahony Niall Sargent
Niall Sargent
Local artist and filmmaker Declan O’Mahony also found the public consultation process and communication of the OPW plans to be lacking. He said that within months of the public exhibition period, the atmosphere had soared and “escalated into a battle zone”.
“It was a fight at that stage,” he said. Through a project, he has documented the local planning battles about the Lee over the course of the past 16 years and the toll that it took on people. “What happens is that those voices, those people that are concerned, their lives are so impacted negatively it eventually turns your blood to acid.”
Did the public have all the information they needed?
Save Cork City’s campaign gained traction and played an important role in the number of submissions received by the OPW that eventually totalled around 1,200. This was the largest number of public submissions ever received according to the agency.
In January 2017, according to minutes released to Noteworthy through an FOI request, the scheme’s steering group discussed the “negative submissions and comments on social media” in relation to the exhibition and agreed that the situation would be “monitored”.
In relation to SCC opposition, Ezra MacManamon, the OPW’s project lead, told Noteworthy that the agency is “not generally accustomed to having significant levels of organised opposition” but that it welcomed “input and commentary” on its plans.
In this light, the OPW said that the period for submissions was extended by 11 weeks to “enable as many people as possible to make submissions”. However, at the steering group’s January meeting it was agreed to extend the deadline as various reports were “not yet put in the public domain”.
Ken Leahy from Arup, the main engineering consultants developing the scheme, clarified to Noteworthy that all required statutory documentation was available at the exhibition stage and that additional technical reports were later made available following “very significant interaction at the public days”.
Several professionals and retired academics in the fields of engineering, climate change, geography and geology also sent letters that raised concerns or alternative options to the proposed flood defences.
Leahy told Noteworthy that while many of the professionals were making comments “proactively” to ensure that important issues were addressed, they were “obviously making comments on the basis of a far lesser amount of data and knowledge”.
He added that “there has been absolutely an openness to take on board the views of other professionals where appropriate, but ultimately OPW, as the agency with a mandate to deliver this scheme, and Arup, as the designer, has to take forward the best scheme based on all of the scientific engineering evidence”.
OPW ‘not sure we would have done anything differently’
The OPW is also adamant that the consultation process went above and beyond statutory requirements over the past 14 years. They cite meetings with interested parties, including landowners and business stakeholders. The Cork Business Association and Cork Chamber are both largely supportive of the LLFRS.
Lawrence Owens of the Cork Business Association said they “called for a lot of changes” in the initial stages but the “collective input from so many sectors” resulted in the OPW delivering a better product. In a statement, Cork Chamber said “as a result of consultation and engagement, the flood defence scheme has advanced considerably”.
The OPW’s MacManamon said that the agency’s experience is that public engagement “has very much grown as the projects have grown over the years and developed”.
“[The OPW] is always very genuinely seeking the input and the commentary from the people that are affected by the scheme and the people that are interested by this scheme. And that is true, right up to the last major public consultation event that happens in any scheme, which is the statutory public exhibition.”
He added that “he’s not sure we would have done anything differently” when asked by Noteworthy if he would make any changes if the OPW was to go through the public consultation again.
During his research on the decision-making process around flood and climate risk assessment, NUI Galway’s Dr Thomas McDermott found that an important element of any successful flood relief scheme is to engage with various stakeholders at an early stage.
In terms of the overall risk assessment process undertaken by the OPW for Cork, he said that it “fits very well with some of what you see discussed in the literature in terms of best practice”.
There was an extensive effort [of] public consultation but in spite of that, the outcome seems to have still been controversial so you have this concerted campaign now against the proposals and quite a bit of controversy around the proposed flood relief scheme.
While there may have been room to engage the wider public more directly at an earlier stage, McDermott said that it is “difficult to get people’s interest at an early stage in these processes”.
Dr James Jeffers, a geographer at Bath Spa University who has studied the conflict around the scheme over the past three years, agrees that a key challenge in all flood schemes rests on how to carry out wider, more engaged public participation at an earlier stage.
He found that the OPW did undertake a fairly extensive stakeholder consultation, as well as attempting some public consultation that just did not manage to engage a wide range of interested parties.
This is a really difficult thing to do, he said. “Forming a consensus on the way forward would be difficult or potentially impossible,” he said, given the wide range of interested groups and individuals who bring forward a diverse set of values, beliefs and expertise to the process.
“But debating these diverse viewpoints in an open way early in the decision-making process should allow all viewpoints to be expressed and explored, in order to determine the best way forward,” he added.
River Lee running through Cork city Niall Sargent
Niall Sargent
“I think there’s a definite problem with legacy,” she said, with a more statutory public consultation process in which the public have a set time to engage with plans rather than a more participatory approach where they have a say in the design from the get go.
This is especially problematic as the complex nature of flooding makes it difficult for people to access information and to get their heads around the wider problem, she explained.
I think we need a much deeper discussion on public consultation and not just the sort of more superficial way in which consultation is being done at the moment. It’s about the fairness of the process as well in terms of how some of these decisions are made.
She said that there were “issues with the level of consultation that was allowed, and the manner in which this consultation happened,” in Cork.
“There was an inability to respond adequately and to engage with what became a growing dissatisfaction with plans from the OPW so much so now that there is an underlying distrust and lack of understanding as to the plans that the OPW has put through,” Revez said. “It is a shame that we’re into this impasse where you can’t use the resources when the resources are there.”
‘The public should have a say’
The Lee project is not the only example of an OPW and local authority-led flooding scheme that has run into objections and communication difficulties with locals.
One scheme with a recent public consultation process is the River Poddle Flood Alleviation Scheme. This river follows a winding route through the southwest of Dublin before joining the Liffey in the city centre.
According to the scheme’s website, it has “overflowed its banks at a number of locations”. South Dublin County Council’s €7 million plan aims to “prevent reoccurrences of such flood events”.
As part of the planning process for the scheme, statutory consultation events were held on 10 and 12 March this year, the same week that schools were shut due to Covid-19. “People were afraid to come out of their houses at that stage,” said Roisin McAleer of Save the Poddle.
The deadline for submissions to An Bord Pleanála was extended a number of times due to the pandemic. The final deadline was last Thursday.
Over the past few years, McAleer has tried to raise awareness of the plans in the community and says that the council and OPW need to do more to get the community involved.
When Noteworthy checked the ‘Public Engagement’ section of the scheme’s website on 15 May, it said “details of upcoming Public Exhibitions will be uploaded to this page as they’re arranged”. Though details of information days were listed in the website’s ‘news’ section, no information was listed on this page at the time.
Screen capture of the Poddle FAS website from 15 May
This page was updated with a list of public information days that had already taken place, as well as details on how to make submissions to An Bord Pleanála about the scheme, soon after Noteworthy sent a press request to the OPW stating that the “public engagement page has very little information”.
The website does not include a brochure or other material that would be easily digestible to the public. Detailed plans submitted as part of the planning application are available on the site, but the planning reference number needed for a submission to An Bord Pleanála is not readily accessible.
The OPW told Noteworthy that the public were kept informed through the updating of social media sites, fixed site notices and newspaper notices. They also asked local politicians “to share this information through their local networks”.
Having to make a submission through this process is not an inclusive way to consult people, according to McAleer, as it costs €50 to object to the planning authority.
“We have a right under the guidelines to meaningful engagement [which] means public input”. She felt that “the public should have a say in the design” and added “that helps create a sense of political advocacy”.
Call for an independent review quashed
In the case of the Lower Lee, the OPW did update its plans to address some concerns raised in submissions. However, Michael McCarthy of the Lee Engineering and Environment Forum (LEEF), an offshoot of Save Cork City, said that the changes were “very cosmetic” and only addressed public realm concerns.
McCarthy, a chartered quantity surveyor, said that LEEF is pushing for an independent review of “serious concerns” that his group have with costs and engineering design that have “potential catastrophic consequences on the built environment in Cork”.
The OPW is clear that its additional reports address any potential issues raised by public submissions, reports by retired academics or reports commissioned by Save Cork City.
A month later, the Council sent a brief one-page letter to the OPW about the motions. The Minister of State for the Office of Public Works and Flood Relief, Kevin ‘Boxer’ Moran, was quick to shoot down the idea.
Minister of State for the Office of Public Works & Flood Relief, Kevin ‘Boxer’ Moran Leah Farrell
Leah Farrell
In August 2018, in a three-page response written on OPW-headed paper released to Noteworthy under FOI regulations, Moran concluded that there is “absolutely no requirement for a further review, which would only bring significant delay to this much-needed investment in Cork”.
Opening his letter by expressing his “disappointment” that councillors would call for such a review, he said that it was also “unfortunate that a lot of misinformation has been put into the public domain by some opponents of the proposed scheme”.
He said that all possible options were addressed through “detailed scientific and engineering study,” that the approach meets international best practice and that he was satisfied the OPW has listened to and addressed public concerns “in a positive and constructive way”.
In a statement, the OPW added that calling for a review after 14 years of rigid analysis is “simply postponing, perhaps for years, the urgent implementation of a flood defence scheme” for the city.
Categorically, OPW will not be recommending any alternative to LLFRS now or in the future.
The motions passed by the Council also called for a review of a tidal barrier option, the costing, location and need for which has also been the subject of much debate and contention.
Would a tidal barrier work?
The tidal barrier option is a cornerstone of Save Cork City’s alternative flood plan alongside the repair of historic quay walls and upstream catchment measures. Tidal barriers are heavy gate systems that temporarily close off bays and estuaries to protect from coastal flooding and can also alleviate river flooding.
In a May 2017 steering group meeting, the OPW advised that further work to explain why alternative measures such as upstream natural flood management measures and a tidal barrage “are not currently viable” was needed but “should be limited to a desk study level only”.
The OPW determined that these options were screened out “with good reason” and that “extensive additional work was not warranted”.
The OPW told Noteworthy that they are satisfied with this appraisal and that it “would not have been prudent use of taxpayer’s monies” to carry out further study of “unviable, and significantly inferior” alternatives.
Advertisement
The OPW analysis, according to Arup’s Ken Leahy, highlighted several other issues beyond cost, including potential impact on protected nature sites, limited storage capacity for fluvial flooding, and a change in currents that would make it unsafe for ship navigation.
[A tidal barrier is] being offered as a type of panacea, which it’s not really. It’s the wrong type of defence concept for the moment, it’s not [in] a suitable location, and it’s not the right time for such a solution.
According to SCC’s Hegarty, the OPW went “one step too far” by publicly singling out a community-based campaign group for criticism. He added that some people stepped back from the campaign because of the amount of stress that it caused. “It was a very unpleasant time,” he said.
“The real advantage for a tidal barrier for Cork is to protect the city centre as it is now, to let us develop it as a historic place and also what it would mean for the protection of the larger city downstream and the docklands,” he added. “The tidal barrier is viable and it can be done economically if we want to do it.”
Why all the walls?
Many of the other objections to the Lee scheme are due to the various types of barriers and walls proposed. “Impact of proposed walls on heritage and visual” was the top ranked concern in the scheme’s report following the public exhibition in 2017.
This is not unusual for the state body, according to Patrick McCabe, who worked with the OPW and a number of council representatives, including Cork City Council, on a collaborative Irish-Dutch project, Irish Rivers 2040.
McCabe is a landscape architect at REDscape Landscape and Urbanism, a firm with branches in both Ireland and the Netherlands. He said that as part of this project the team found that “about 80% of the sites studied in Ireland were using walls to stop the water”.
They examined 43 areas of flooding marked for improvement. The final report states: “the clear majority of the projects being proposed under the current process comprise structural flood protection solutions”.
McCabe said that “although we understand that there’s an extreme and urgent need for the walls, we also realised that they are not a sustainable solution moving forward. As water rises, then the only solution to progress on top of them is to build the walls higher and higher.”
As part of the Irish River 2040 project, two teams looked at flooding issues in Cork’s inner city and the docklands. Self-moving walls, water stairs, water storage in car parks and sports centres as well as a transformative car-free zone on the quays were proposed.
McCabe said that the OPW were very open to new approaches but “despite the fact that it put a lot of time and effort into [them], it discovered that it kept getting the same solutions”.
He “recommended strongly” to the OPW to test their design-led approach around a series of pilot projects “to give a safe environment to the OPW and stakeholders for testing, learning and assessing”. However, he said the “OPW stated that these potentially infringe on tender rules”, different to his experience in the Netherlands where it is “common practice”.
“Not only are they very often unattractive, it’s extremely expensive to implement some of these downstream solutions, the construction of walls and quays through urbanized areas,” McCabe said, adding that they can also “create a lot of conflict with the public”. He felt new approaches need to be addressed in public policy flooding policies.
River Lee at Inniscarra Bridge Niall Sargent
Niall Sargent
Making room for the river
One very different approach used in the Netherlands was a major flood improvement scheme, Room for the River. Representatives from Cork City Council visited the Dutch scheme last year and Hans Brouwer, programme manager of river management at the Dutch Ministry of Infrastructure & Water Management, was there to show them their results.
“At one level, [flooding] is a local problem but it should be combined with a river basin approach and we did that with Room for the River,” explained Brouwer. This scheme consisted of 34 individual projects which “form a kind of chain of pearls”. It was completed on time and on budget in 2015.
When there was a problem with flooding, the Dutch response was always strengthening and heightening dikes and walls, said Brouwer.
What we did for centuries is height against water. We learned that you can fight but in the end, you can never win.
Instead, they looked towards ecology where ideas had emerged to build with nature instead of fighting it. By examining the whole river as one system, they found a way to accommodate extra water but not let it lead to a higher river level by “spreading the water over a bigger distance” or giving more room for the river.
This approach took time and planning, and required all 34 projects to be completed to work. The team were also working against a backdrop of urgency following a series of tidal storm surges and river floods.
The most severe was in 1995 when 250,000 people were evacuated from the central parts of the country which left a lasting impact, explained Brouwer, who said there were queues of cars similar to what you would see in a disaster movie.
After this, “the first reaction was heightening and strengthening dikes”, but this halted after the first Intergovernmental Panel on Climate Change (IPCC) report which predicted sea level rises. After this, the project was re-evaluated in order to respond to climate change.
Natural measures considered
The OPW told Noteworthy that all options, including nature-based and ‘making room for the river’ type solutions were considered but “proven not to be effective at sufficient scale to be viable for Cork”.
It added that making the floodplain available to the river is being done as part of the LLFRS in areas upstream but in terms of Cork city,“it is not particularly effective” due to tidal flood risk and high density areas.
Designs for the Lower Lee Flood Relief Scheme OPW
OPW
Click this link to view this GIF, if it is not working for you.
Arup’s Leahy said that “defenses on the quayside are low level. The majority of defenses are no higher than knee height and the highest ones are around belly button or navel height.” He added that “the scheme has been amended following public consultation”.
In a follow-up statement, the LLFRS project team clarified that the only locations where proposed walls are higher than this is at a private property in the western part of the city as well as some lengths along Sunday’s Well Road and the Lee Road.
Transforming communities into co-designers
The river basin approach was evident in Room for the River. Giving an example of this, Brouwer explained that the river level was reduced by around two feet in one town in order to subsequently reduce the level in a downstream town by one foot.
Homeowners and farmers now living in a floodplain were given the option to sell their property to the Government at a non-flood risk price or be compensated for any flooding. This was met with some resistance, according to Brouwer, but their “bottom up approach” was key.
Normally, we would have one goal: flood protection. Now we had two goals: flood protection and improved spatial quality of the river area. Looking back, that was a very wise step because that gives the possibility for us to get knowledge about the history, use and ambitions of the area.
They worked with communities from the start with the dual goal of improving the area as well as constructing flood protection. This transformed communities “from consumers of policy into co-designing the policy”.
Though Brouwer felt others can be “inspired by the approach”, he added, “it’s very based on our culture and our physical geography”. Each flood scheme needs to be adapted to the local physical characteristics and one of “the basics is getting knowledge about the area”.
‘Lay knowledge is undervalued’
One way of obtaining this local knowledge is through co-design and co-production. These are not only beneficial in terms of reduced conflict with local communities, but also can reduce overall costs, according to Dr Sarah Fitton, director of Aurora Engagements.
She conducted her PhD research on co-production in UK flood schemes. In her research, which was sponsored by Arup, she argues that “schemes tend to focus on technical solutions, with the social impact, including needs and concerns of the local community, seen as secondary”.
Lee fields in Cork city Niall Sargent
Niall Sargent
She also explains that co-production isn’t simply allowing communities to have a design input. Instead, it brings local communities and professionals together to work on design and even construction and management.
Fitton also found that project teams in the cases she studied would have saved time and money if they had engaged with communities earlier. One scheme she studied in Manchester was planned in the middle of allotments that the community valued and “there was little consultation as to what the local community wanted”.
These plans were overturned and a new design was created with new consultants which resulted in an immense amount of “abortive work and wasted money”, she said.
That’s not necessarily the fault of the environment agency or the consultants that worked on it, it’s just the way that the process is geared up. Lay knowledge is undervalued. The focus wasn’t talking to the community first. It was designing something that technically provided flood protection.
Putting plans ‘in the melting pot’
A group calling on the OPW for this type of community approach is Dodder Action. One of their members, Victoria White, who is married to Green Party leader Eamon Ryan, hopes the next phase of the River Dodder Flood Alleviation Scheme will not involve walls as previous phases have.
Works have already been done or are in progress from the Clonskeagh Bridge through Donnybrook and past the Aviva Stadium.
As you move up the Dodder, there’s less population and there’s just no excuse, in my view, to wall the river in, in any shape or form.
She feared that this public benefit “is not quantifiable” within the terms of reference for these projects. “You’re talking about one of the finest city rivers in Europe and a wildlife corridor of huge significance.”
The OPW has told her they’re putting the plans “back in the melting pot” and she is really hopeful that is the case due to the “new way of looking at rivers in the era of climate change, making room for the river”.
Balancing the benefits
Dr Sebastiaan van Herk, partner and director of Bax & Company in Barcelona, has come up with ways to quantify benefits not normally included in the cost benefit analysis of flood schemes, including health benefits, reduced crime rates, and biodiversity.
To do so effectively, the project team needs to be made up of different non-technical members from various domains and organisations, including community groups, according to van Herk. This makes it more complex but “these people can have good ideas [and] contribute.”
When conducting the cost benefit analysis of the “preferred scheme” for Cork city, the OPW stated in the Options Report that the benefit of the flood works is “the reduction in risk of flooding to land and property”. It does not include any of the benefits mentioned by van Herk.
Social criteria were included as part of the Multi Criteria Assessment to discover “the effectiveness of each of the viable options”. The social criteria included risk to human life and health, risk to community and risk to social amenities.
Targets for these criteria were almost entirely focused on a “100% reduction” in properties or sites at risk from flooding. There was one exception which aimed for the “enhancement or creation of social amenity sites”.
The ‘quick win’ of Morrison’s Island
Morrison's Island (right) in Cork city Niall Sargent
Niall Sargent
The LLFRS has still to be signed off and approved. However, there are two other recent projects that have incorporated flood relief works in Cork that have been met with legal challenges by Save Cork City.
In their submission to An Bord Pleanála in February 2019, Save Cork City said that Morrison’s Island was “a part of the LLFRS and the project splitting of this one part denies the correct process that should include a full EIA [environmental impact assessment] and further public consultation”.
Cork City Council’s Director of Infrastructure Services, Gerry O’Beirne, told Noteworthy that “Morrison’s Island is a standalone project, it doesn’t involve project splitting”. He added that “it’s very poorly presented at the moment. Its predominant use is car parking”. This is why the council is “progressing with [this] public realm project”.
In bringing that forward, we have to give consideration then to the flood risks in that area and it’s a particularly low lying part of the city. Those flood protection works are fully compatible with the Lower Lee project. And they effectively future proof the works that we’re doing in improving the public realm of the area.
MacManamon from the OPW echoed these remarks and added “anywhere we go with a flood relief scheme, people are always conscious the process is so slow. They’re looking to see, are there any quick wins that we can deliver, interim works.”
Rising waters, rising costs
So, where does the scheme currently stand? MacManamon said the project team are at “a very advanced stage of finishing off the documentation and finalizing it with a view to updating the exhibition documents and preparing a new environmental impact assessment report”.
Once this is complete, the scheme will “be sent as a package to the Minister for Public Expenditure and Reform for confirmation”. The team hoped that this would happen later this year, most likely “late quarter two, or maybe early quarter three”.
Final costs for the project are, as yet, unknown. However, in a statement to Noteworthy, the OPW stated it is likely these costs will have risen.
The preferred option for the scheme was estimated to cost just under €130 million in December 2016. The LLFRS website states there will be a “€140m investment in flood protection” and an additional “€20m to repair historic walls”.
A revised cost estimate will be drawn up when submitting the scheme to the Minister, according to the OPW. “Due to inflation since the original costs were drawn up four years ago and the incorporation of various design changes based on public submissions from the Exhibition stage, we would expect these costs to rise.”
Calling for a new approach
McCabe, who was involved in the Irish-Dutch collaborative project, Irish Rivers 2040, says that the flooding problem in Ireland can be viewed like a tyre that has “little holes in it”. He compares the OPW approach to plugging holes in the short term, with Cork City being an “important puncture” to fix.
However, in the long term, he envisages a future with “more holistic solutions that don’t require walls as often”. This can be done using “an integrated approach where you develop a plan with landowners, local authorities, farmers and so on”. However, he fears that “things tend to change only when bad things happen”.
John Hegarty of Save Cork City Niall Sargent
Niall Sargent
From speaking to communities impacted by flood schemes around the country, trust in local authorities and councils was often eroded by the current process. UCC’s Revez says “there’s a definite problem with legacy” and feels the institutional culture of the OPW should evolve. “In some respects, they may be evolving as the issues are pressed further, perhaps not evolving fast enough to deal with the problem.”
White of Dodder Action says the “Lee scheme is just the same thing repeated over and over”. She adds that the process for developing flood schemes in Ireland needs to be “interrogated and untangled”.
The draft programme for government announced earlier this week wants “to give towns a strong voice at the heart of local authority decision making” by ensuring participation in local government is “actively encouraged and facilitated”.
***
Back in Cork, the project team are on target to submit the final plans for the Lower Lee scheme in the coming months. They hope to bring some of the learnings from Cork to other schemes, such as the use of more visual information such as photomontages as well as giving people information on social media.
Over a decade after the last major flood, for the Lee scheme’s project team, Cork’s future plans are almost certain, but a current of uncertainty and doubt still continues to flow through some parts of the community.
Sometimes you “have to accept that you won’t always get a consensus” says Arup’s Leahy. “You’ll always have the situation that some people will disagree. And you may have to just agree to disagree knowing that you’re the body with the mandate to deliver the scheme, and you have a broader public obligation.”
Save Cork City’s Hegarty says “if the solution was right, we would support it”, adding “the more people are involved in making a decision, the happier we would be”.
***
This investigation was carried out by Maria Delaney and Niall Sargent of Noteworthy, with additional reporting by Peter McGuire. It was proposed and funded by you, our readers.
Noteworthy is the investigative journalism platform from TheJournal.ie. You can support our work by helping to fund one of our other investigation proposals or submitting an idea for a story. Click here to find out more >>
Readers like you are keeping these stories free for everyone...
A mix of advertising and supporting contributions helps keep paywalls away from valuable information like this article.
Over 5,000 readers like you have already stepped up and support us with a monthly payment or a once-off donation.
To embed this post, copy the code below on your site
Close
13 Comments
This is YOUR comments community. Stay civil, stay constructive, stay on topic.
Please familiarise yourself with our comments policy
here
before taking part.
Pope Francis ‘alert and joking’ during hospital visit from Italian Prime Minister
33 mins ago
619
6
Turfed Out
Taoiseach warns of impact on children as Cork Ukrainian refugees get warning to move in March
Niall O'Connor
6 mins ago
1
The Morning Lead
Government to make cabin homes in back gardens exempt from planning
Christina Finn
16 hrs ago
90.9k
112
Your Cookies. Your Choice.
Cookies help provide our news service while also enabling the advertising needed to fund this work.
We categorise cookies as Necessary, Performance (used to analyse the site performance) and Targeting (used to target advertising which helps us keep this service free).
We and our 148 partners store and access personal data, like browsing data or unique identifiers, on your device. Selecting Accept All enables tracking technologies to support the purposes shown under we and our partners process data to provide. If trackers are disabled, some content and ads you see may not be as relevant to you. You can resurface this menu to change your choices or withdraw consent at any time by clicking the Cookie Preferences link on the bottom of the webpage .Your choices will have effect within our Website. For more details, refer to our Privacy Policy.
We and our vendors process data for the following purposes:
Use precise geolocation data. Actively scan device characteristics for identification. Store and/or access information on a device. Personalised advertising and content, advertising and content measurement, audience research and services development.
Cookies Preference Centre
We process your data to deliver content or advertisements and measure the delivery of such content or advertisements to extract insights about our website. We share this information with our partners on the basis of consent. You may exercise your right to consent, based on a specific purpose below or at a partner level in the link under each purpose. Some vendors may process your data based on their legitimate interests, which does not require your consent. You cannot object to tracking technologies placed to ensure security, prevent fraud, fix errors, or deliver and present advertising and content, and precise geolocation data and active scanning of device characteristics for identification may be used to support this purpose. This exception does not apply to targeted advertising. These choices will be signaled to our vendors participating in the Transparency and Consent Framework.
Manage Consent Preferences
Necessary Cookies
Always Active
These cookies are necessary for the website to function and cannot be switched off in our systems. They are usually only set in response to actions made by you which amount to a request for services, such as setting your privacy preferences, logging in or filling in forms. You can set your browser to block or alert you about these cookies, but some parts of the site will not then work.
Targeting Cookies
These cookies may be set through our site by our advertising partners. They may be used by those companies to build a profile of your interests and show you relevant adverts on other sites. They do not store directly personal information, but are based on uniquely identifying your browser and internet device. If you do not allow these cookies, you will experience less targeted advertising.
Functional Cookies
These cookies enable the website to provide enhanced functionality and personalisation. They may be set by us or by third party providers whose services we have added to our pages. If you do not allow these cookies then these services may not function properly.
Performance Cookies
These cookies allow us to count visits and traffic sources so we can measure and improve the performance of our site. They help us to know which pages are the most and least popular and see how visitors move around the site. All information these cookies collect is aggregated and therefore anonymous. If you do not allow these cookies we will not be able to monitor our performance.
Store and/or access information on a device 102 partners can use this purpose
Cookies, device or similar online identifiers (e.g. login-based identifiers, randomly assigned identifiers, network based identifiers) together with other information (e.g. browser type and information, language, screen size, supported technologies etc.) can be stored or read on your device to recognise it each time it connects to an app or to a website, for one or several of the purposes presented here.
Personalised advertising and content, advertising and content measurement, audience research and services development 133 partners can use this purpose
Use limited data to select advertising 103 partners can use this purpose
Advertising presented to you on this service can be based on limited data, such as the website or app you are using, your non-precise location, your device type or which content you are (or have been) interacting with (for example, to limit the number of times an ad is presented to you).
Create profiles for personalised advertising 75 partners can use this purpose
Information about your activity on this service (such as forms you submit, content you look at) can be stored and combined with other information about you (for example, information from your previous activity on this service and other websites or apps) or similar users. This is then used to build or improve a profile about you (that might include possible interests and personal aspects). Your profile can be used (also later) to present advertising that appears more relevant based on your possible interests by this and other entities.
Use profiles to select personalised advertising 74 partners can use this purpose
Advertising presented to you on this service can be based on your advertising profiles, which can reflect your activity on this service or other websites or apps (like the forms you submit, content you look at), possible interests and personal aspects.
Create profiles to personalise content 36 partners can use this purpose
Information about your activity on this service (for instance, forms you submit, non-advertising content you look at) can be stored and combined with other information about you (such as your previous activity on this service or other websites or apps) or similar users. This is then used to build or improve a profile about you (which might for example include possible interests and personal aspects). Your profile can be used (also later) to present content that appears more relevant based on your possible interests, such as by adapting the order in which content is shown to you, so that it is even easier for you to find content that matches your interests.
Use profiles to select personalised content 32 partners can use this purpose
Content presented to you on this service can be based on your content personalisation profiles, which can reflect your activity on this or other services (for instance, the forms you submit, content you look at), possible interests and personal aspects. This can for example be used to adapt the order in which content is shown to you, so that it is even easier for you to find (non-advertising) content that matches your interests.
Measure advertising performance 124 partners can use this purpose
Information regarding which advertising is presented to you and how you interact with it can be used to determine how well an advert has worked for you or other users and whether the goals of the advertising were reached. For instance, whether you saw an ad, whether you clicked on it, whether it led you to buy a product or visit a website, etc. This is very helpful to understand the relevance of advertising campaigns.
Measure content performance 59 partners can use this purpose
Information regarding which content is presented to you and how you interact with it can be used to determine whether the (non-advertising) content e.g. reached its intended audience and matched your interests. For instance, whether you read an article, watch a video, listen to a podcast or look at a product description, how long you spent on this service and the web pages you visit etc. This is very helpful to understand the relevance of (non-advertising) content that is shown to you.
Understand audiences through statistics or combinations of data from different sources 72 partners can use this purpose
Reports can be generated based on the combination of data sets (like user profiles, statistics, market research, analytics data) regarding your interactions and those of other users with advertising or (non-advertising) content to identify common characteristics (for instance, to determine which target audiences are more receptive to an ad campaign or to certain contents).
Develop and improve services 79 partners can use this purpose
Information about your activity on this service, such as your interaction with ads or content, can be very helpful to improve products and services and to build new products and services based on user interactions, the type of audience, etc. This specific purpose does not include the development or improvement of user profiles and identifiers.
Use limited data to select content 37 partners can use this purpose
Content presented to you on this service can be based on limited data, such as the website or app you are using, your non-precise location, your device type, or which content you are (or have been) interacting with (for example, to limit the number of times a video or an article is presented to you).
Use precise geolocation data 42 partners can use this special feature
With your acceptance, your precise location (within a radius of less than 500 metres) may be used in support of the purposes explained in this notice.
Actively scan device characteristics for identification 24 partners can use this special feature
With your acceptance, certain characteristics specific to your device might be requested and used to distinguish it from other devices (such as the installed fonts or plugins, the resolution of your screen) in support of the purposes explained in this notice.
Ensure security, prevent and detect fraud, and fix errors 82 partners can use this special purpose
Always Active
Your data can be used to monitor for and prevent unusual and possibly fraudulent activity (for example, regarding advertising, ad clicks by bots), and ensure systems and processes work properly and securely. It can also be used to correct any problems you, the publisher or the advertiser may encounter in the delivery of content and ads and in your interaction with them.
Deliver and present advertising and content 92 partners can use this special purpose
Always Active
Certain information (like an IP address or device capabilities) is used to ensure the technical compatibility of the content or advertising, and to facilitate the transmission of the content or ad to your device.
Match and combine data from other data sources 65 partners can use this feature
Always Active
Information about your activity on this service may be matched and combined with other information relating to you and originating from various sources (for instance your activity on a separate online service, your use of a loyalty card in-store, or your answers to a survey), in support of the purposes explained in this notice.
Link different devices 48 partners can use this feature
Always Active
In support of the purposes explained in this notice, your device might be considered as likely linked to other devices that belong to you or your household (for instance because you are logged in to the same service on both your phone and your computer, or because you may use the same Internet connection on both devices).
Identify devices based on information transmitted automatically 81 partners can use this feature
Always Active
Your device might be distinguished from other devices based on information it automatically sends when accessing the Internet (for instance, the IP address of your Internet connection or the type of browser you are using) in support of the purposes exposed in this notice.
Save and communicate privacy choices 60 partners can use this special purpose
Always Active
The choices you make regarding the purposes and entities listed in this notice are saved and made available to those entities in the form of digital signals (such as a string of characters). This is necessary in order to enable both this service and those entities to respect such choices.
have your say