Advertisement

We need your help now

Support from readers like you keeps The Journal open.

You are visiting us because we have something you value. Independent, unbiased news that tells the truth. Advertising revenue goes some way to support our mission, but this year it has not been enough.

If you've seen value in our reporting, please contribute what you can, so we can continue to produce accurate and meaningful journalism. For everyone who needs it.

Fueling of the IM-1 lander taking place this morning SpaceX

Private US Moon lander successfully launches 24 hours after flight was delayed

The Moon lander had lift-off at 6.05am Irish time.

A US PRIVATE Moon lander has successfully launched 24 hours after its flight was delayed due to fuel issues.

The Nova-C Odysseus lander, built by Texas-based space flight company Intuitive Machines (IM), could become the first private mission – called IM-1 – to land intact on the lunar surface.

The Moon lander had lift-off at 6.05am Irish time this morning atop SpaceX’s Falcon 9 rocket from Cape Canaveral in Florida, SpaceX posted on X (formerly Twitter).

It comes a month after another US spacecraft, Peregrine, failed to touch down following a fuel leak.

The failure of Peregrine, operated by US company Astrobotic, marked the third time a private company had been unable to achieve a soft landing on the lunar surface.

The Beresheet lander, built by Israel’s SpaceIL, crashed during descent in 2019, while the Hakuto-R M1 lander, from Japanese company ispace, was destroyed while attempting to land in April last year.

Odysseus would be the first US Moon landing since the final mission of the Apollo programme – Apollo 17 – more than 50 years ago.

Odysseus is a hexagonal cylinder about 13ft (4m) tall and 5ft (1.57m) wide and weighs 1,488lb (675kg).

It is part of Nasa’s Commercial Lunar Payload Services initiative, which aims to involve commercial companies in the exploration of the Moon as the space agency focuses on getting astronauts back there through its Artemis programme.

If all goes to plan, Odysseus could attempt a lunar landing on February 22.

The landing site will be at Malapert A, a crater near the Moon’s south pole.

Once it is on the surface, Odysseus will operate for roughly two weeks, or one lunar day.

Onboard the lander are 12 payloads, which includes a Nasa instrument known as Scalpss (Stereo Cameras for Lunar Plume-Surface Studies) – a four-camera system which aims to capture Odysseus’s descent to the lunar surface.

MDA UK, a Canadian space technology company with offices in Harwell, Oxfordshire, is developing landing sensors for three IM missions – the other two planned for later in the year – with funding from the UK Space Agency (UKSA).

The UKSA has spent £3.4 million (€4m), spread across these three missions as part of its partnership with MDA UK.

The lander will also be carrying a sculpture – called Moon Phases – by American artist Jeff Koons.

Odysseus will be insulated with a lightweight fabric – a shimmery gold material that normally lines the insides of ski jackets – made by US sports apparel company Columbia Sportswear.

Close
12 Comments
This is YOUR comments community. Stay civil, stay constructive, stay on topic. Please familiarise yourself with our comments policy here before taking part.
Leave a Comment
    Submit a report
    Please help us understand how this comment violates our community guidelines.
    Thank you for the feedback
    Your feedback has been sent to our team for review.

    Leave a commentcancel

     
    JournalTv
    News in 60 seconds